Realizations

Over the years, Camille Blais et Fils Ltd has acquired incomparable experience, no matter what the soil type we have to work with. This has allowed us to carry out projects of virtually any scale and complexity.

The following are just some of our projects:


Échangeur Turcot - 3 Tunnels

- 1019 drilled pile

Turcot - Pullman Blvd Bridge

- 18 caisson pile 84'' diameter
- 506 drilled piles 16'' diameter

Montreal, CUSM

- 55 caisson piles of 1067 mm diameter

Montreal Port - Quay 76-77

- 12 caisson pile of 610 mm diameter
- 38 caisson pile of 762 mm diameter

Québec, interchange Highways Charest / Robert-Bourassa

Date: 2009
Master builder: Minister of Transport
Work:
-417 drived piles of 406mm and 323mm
-2 caisson piles of 2133mm

Gatineau, bridge road 148

Date: 2009
Master builder: Minister of Transport
Work:
-35 drilled caissons of 406mm

Mirabel, station Chenier/Outaouais

Date: 2009
Master builder: Hydro-Quebec
Work:
-50 caisson piles of 2743mm
-24 caisson piles of 1016mm

Marieville, bridges Highway 10

Date: 2008
Master builder: Minister of Transport
Work:
-104 drilled piles inclined of 406mm

La Tuque, viaduct road 155

Date: 2008
Master builder: Canadien National
Work:
-Retaining wall type "Berlinois"
including 4 anchors's rows

La Pocatière, Aréna Bombardier

Date: 2008
Master builder: City of La Pocatière
Work:
-257 drived piles

Parc des Laurentides, bridge Highway 169

Date: 2008
Master builder: Minister of Transport
Work:
-72 drilled piles inclined of 324mm

Lévis, Davie Québec inc.

Date: 2007
Master builder: Davie Québec inc.
Work:
-127 drived piles
-8 drilled piles
-31 rock anchors

Lochaber, bridge Highway 50

Date: 2007
Master builder: Minister of Transport
Work:
-33 drived piles
-42 caisson piles of 323mm
-Sheet piling caisson

Beauceville, bridges Highway 73

Date: 2006 to 2007
Master builder: Minister of Transport
Work:
-210 anchor piles of 323mm

Sept-Îles, Duc d'Albe quai 41

Date: 2006
Master builder: Sept-Îles Port Authority
Work:
-4 caisson piles of 1067mm

Gatineau, bridge Boulevard St-Laurent

Date: 2006
Master builder: Minister of Transport
Work:
-104 drived piles
-37 caisson piles of 457mm
-69 rock anchors

Montréal, Port de Montréal

Date: 2002
Master builder: Montréal Port Authority
Work:
-176 drilled piles of 610mm

St-Fançois, Garant's distribution center

Date: 1999 and 2006
Master builder: Garant inc.
Work:
-391 drived piles

Northwest Territories

Date: 1989 to 1991
Master builder: Minister of National Defence
Work:
-1325 drilled piles of 162mm in the permafrost

Boischâtel and Cristalline

Date: 1980
Master builder: Alex Coulombe inc.
Work:
-Artesian wells