CBF Drilling had the opportunity to participate in the construction of a bike path—the only one of its kind in North America—that runs alongside Highway 132 and passes through the towns of Oka and Mont-Saint-Hilaire. This large-scale project is part of the Greater Montreal Green and Blue Network initiative, which stems from the Metropolitan Land Use and Development Plan (PMAD).
Client
EBC inc.
Expertise(s)
Bored piles
Location
Boucherville
Year
2018
Raise your expertise to the level of expert consultant
Section of the structure on piles
Piles installed
Length of piles
Combine strategic vision and technical mastery on each project
One of the major challenges of this infrastructure project was its 1,7 km section built on piles along the St. Lawrence River, where space was extremely limited between the highway and the riverbank. These conditions required the use of innovative drilling techniques adapted to the site’s geotechnical constraints.
A job done according to the rules of the art
To meet this challenge, Forage CBF installed 481 bored piles, thereby ensuring optimal stability despite the difficult ground conditions. The use of specialized equipment made it possible to work efficiently, even in steeply sloped areas along the embankment leading to the river. In total, more than 12 000 meters of bored piles were installed as part of the project, with some reaching lengths exceeding 25 meters, resulting in unparalleled speed and efficiency in execution.