Cycling and pedestrian path connecting the cities of Oka and Mont-Saint-Hilaire

CBF Drilling had the opportunity to participate in the construction of a bike path—the only one of its kind in North America—that runs alongside Highway 132 and passes through the towns of Oka and Mont-Saint-Hilaire. This large-scale project is part of the Greater Montreal Green and Blue Network initiative, which stems from the Metropolitan Land Use and Development Plan (PMAD).

Client

EBC inc.

Expertise(s)

Bored piles

Location

Boucherville

Year

2018

Raise your expertise to the level of expert consultant

Section of the structure on piles

1,7

Piles installed

481

Length of piles

25

Combine strategic vision and technical mastery on each project

One of the major challenges of this infrastructure project was its 1,7 km section built on piles along the St. Lawrence River, where space was extremely limited between the highway and the riverbank. These conditions required the use of innovative drilling techniques adapted to the site’s geotechnical constraints.

A job done according to the rules of the art

To meet this challenge, Forage CBF installed 481 bored piles, thereby ensuring optimal stability despite the difficult ground conditions. The use of specialized equipment made it possible to work efficiently, even in steeply sloped areas along the embankment leading to the river. In total, more than 12 000 meters of bored piles were installed as part of the project, with some reaching lengths exceeding 25 meters, resulting in unparalleled speed and efficiency in execution.

Thanks to our expertise in deep foundations and innovative drilling techniques, we were able to successfully complete this complex project, ensuring speed, precision and sustainability for a green infrastructure that will benefit future generations.