Little Long Dam Safety Project

As part of the Little Long Dam (LLD) safety project in Kapuskasing, Ontario, Forage CBF was contracted to construct two erosion control walls to strengthen the dam's stability.

Client

Peter Kiewit Sons ULC

Expertise(s)

Combined walls
Rock Anchors

Location

Kapuskasing, Ontario

Year

2021 à 2023

Raise your expertise to the level of expert consultant

60" diameter box piles up to 25 m deep

36

Pairs of sheet piles up to 20 m deep

43

Rock hardness

250

Combine strategic vision and technical mastery on each project

These combined walls (combi-walls) are made of sheet piles and caissons, and their support system relies on permanent rock anchors. The nature of the soil, composed of highly competent rock, required the use of advanced techniques, including cluster drilling.

A job done according to the rules of the art

To construct the combined walls, we installed 36 60-inch diameter caisson piles, reaching depths of up to 85 feet, with a socket in the Canadian Shield rock, totaling nearly 2,500 feet of drilling. In addition, more than 4,500 linear feet of sheet piling were installed to ensure effective support. Finally, 18 double-corrosion-protected rock anchors were drilled and tensioned, reaching depths ranging from 100 to 120 feet.

Thanks to our expertise in support work and anchors, we have contributed to the protection and sustainability of this essential infrastructure.