As part of the construction work for Lot 10 at Montreal-Trudeau International Airport, Forage CBF was commissioned to build a complex retaining system in a dense, highly regulated urban environment.
Client
Montreal-Trudeau International Airport
Expertise(s)
Secant walls
Location
Montreal
Year
2019
Raise your expertise to the level of expert consultant
W27 beam installations in secant piles
Percentage tolerance on verticality and 50mm on positioning
Secant piles 1,000 mm in diameter, 70 to 80 feet deep, with approximately +/- 20 feet of bedrock
Combine strategic vision and technical mastery on each project
The team drilled 100 intersecting piles with a diameter of 1000 mm, reaching depths of 70 to 80 feet, including approximately 20 feet into bedrock. The entire project was carried out with a strict tolerance of 1% for verticality and 50 mm for positioning, ensuring extremely high precision.
A job done according to the rules of the art
To complete the support system, 50 W27 beams were integrated directly into the intersecting piles, thereby ensuring the structure’s stability for the next phases of the project.