Northwest Miramichi River Bridge N°1, Anderson Route N°8

As part of the construction of the Northwest Miramichi River Bridge No. 1 on Anderson Route No. 8 in New Brunswick, Forage CBF was mandated to carry out the deep foundations of this essential infrastructure.

Client

Caldwell & Ross ltd.

Expertise(s)

Caisson Piles

Location

Miramichi, New Brunswick

Year

2020-2021

Raise your expertise to the level of expert consultant

2 m diameter caissons

10

Length of installed caisson piles

720

Combine strategic vision and technical mastery on each project

The work included the installation of 10 2 m diameter caisson piles, reaching depths of up to 235 ft per caisson, including the socket. These massive piles ensure the stability and durability of the bridge by securely anchoring its structure in the ground, despite the challenges posed by local geotechnical conditions.

A job done according to the rules of the art

Thanks to our expertise in deep foundations and caisson piles, we contributed to the success of this major infrastructure, guaranteeing optimal resistance to loads and environmental conditions.