Deep Foundations
As part of the Île-aux-Tourtes Bridge reconstruction project, our expertise in deep foundations, retaining structures and marine works was used to ensure the stability and durability of this essential infrastructure.
Client
CNPIAT
Expertise(s)
Caisson Piles
Sheet pile support
Micropiles
Location
Vaudreuil-Dorion
Year
2023 à 2025
Raise your expertise to the level of expert consultant
60" diameter caissons
Rock hardness
Linear meters of sheet pile support
Combine strategic vision and technical mastery on each project
This project, carried out between 2023 et 2025 and Vaudreuil-Dorion, includes the installation of 141 marine caissons and 102 land caissons with a 60" diameter, as well as 12 72" caisson piles.
A job done according to the rules of the art
To ensure optimal support, more than 650 linear meters of sheet piles were installed, along with 18 12.75-inch micropiles. The nature of the soil, particularly rocky and dense in certain areas, required the use of advanced techniques, including cluster drilling. Some caisson piles also had to be assembled with joints to reach depths of more than 120 feet.