As part of the Highway 35 extension to Pike River, Forage CBF was mandated to lay the deep foundations for the infrastructure allowing the highway to cross the Brochets River.
Client
CRT Construction inc.
Expertise(s)
Bored piles
Caisson Piles
Rock Anchors
Location
Pike River
Year
2022
Raise your expertise to the level of expert consultant
Rock Anchors
84 in and 96 in diameter caissons
24" diameter bored piles
Combine strategic vision and technical mastery on each project
Our work included the installation of caisson piles at the piers and bored piles at the bridge abutments, as well as rock anchors for the central pier foundation. This project also included the construction of a bridge over Champlain Road, in connection with the highway extension.
A job done according to the rules of the art
To ensure the stability of these infrastructures, we installed 14 rock anchors, reaching a depth of 11 m into the rock, with 46 mm anchors benefiting from double corrosion protection. In addition, 12 caisson piles were installed, comprising 6 piles of 96 in. and 6 piles of 84 in. diameter. Finally, 124 bored piles of 24 in. diameter were embedded in the rock and a socket was drilled.
Thanks to our expertise in deep foundations and anchors, we contributed to the completion of this major project, guaranteeing the durability and solidity of the region's road infrastructure.