Station 148 Compressor Unit Addition

As part of the Station 148 Compressor Unit Addition à The CedarsForage CBF was commissioned to carry out deep foundations and retaining structures in order to guarantee the stability of TC Energy.

Client

Ganotec

Expertise(s)

Driven piles
Sheet piles
Sheet pile support

Location

The Cedars

Year

2020

Raise your expertise to the level of expert consultant

Number of piles driven

396

Total length of piles installed

17000

Sheet pile support

460

Combine strategic vision and technical mastery on each project

The work included the installation of several friction driven piles, with varying diameters: 8.625 in, 10.75 in, 12.75 in and 16 in.

A job done according to the rules of the art

The piles required extensions to reach the required depths, reaching 44 meters deep. In addition, sheet pile support was installed over 460 linear meters, with a shoring system to ensure optimal strength.

Thanks to our expertise in driven piles and support, we contributed to the creation of sustainable and secure infrastructure adapted to the requirements of this energy project.