Deep Foundations
As part of the Réseau express métropolitain (REM) project, Forage CBF was mandated to carry out deep foundations and support work across several sectors, including Montreal, Brossard and Saint-Eustache, from 2018 to 2023. This major infrastructure project aimed to deploy a structuring and modern transportation network for the metropolitan region.
Client
NouvLR
Expertise(s)
Box piles
Bored piles
Driven piles
Drilling
Berlin Walls
Location
Montreal, Brossard and Saint-Eustache
Year
2018 to 2023

Raise your expertise to the level of expert consultant
Box piles from 1 m to 3.6 m in diameter
16 in. to 24 in. diameter bored piles
24" diameter driven piles
Retaining walls in Berlin and secant walls
Combine strategic vision and technical mastery on each project
Our work included the installation of over 700 caissons, with diameters ranging from 1.0 m to 3.6 m, as well as over 2,000 bored piles, measuring between 406 mm and 624 mm in diameter. In addition, 250 driven piles, each 624 mm in diameter, were installed to enhance the stability of the infrastructure.
In terms of retaining walls, we have completed over 20,000 linear feet of Berlin walls and 5,000 square feet of secant walls, ensuring the safety and durability of deep excavations and retaining structures.
A job done according to the rules of the art
Thanks to our expertise in box piles, bored piles, driven piles and advanced supports, we have contributed to the development of this key infrastructure for urban mobility.